Use the corresponding calculator with values for your product or project. This guide cannot verify local technical rules.

Open German calculator →

Step-by-step guidance

1. Choose the correct physical inputs

Compute a theoretical table feed using effective teeth, feed per tooth and spindle speed, then estimate travel time for a set toolpath. Match all readings to the same operating condition. Confirm whether dimensions, forces or quantities are entered in the stated units; illustrative defaults must be replaced by actual measurements.

2. Compute with coherent units

Table feed [mm/min] = rpm × effective tooth count × feed per tooth [mm]; time [min] = total path [mm] / table feed. Work through the conversion factors before comparing the model result with equipment data. This calculator evaluates the stated simplified physical relationship, not an independent measurement.

3. Check the practical limits

At 3,000 rpm, four teeth and 0.05 mm/tooth the feed is 600 mm/min; 210 mm travel takes 21 seconds. The calculation does not establish safe operation or equipment suitability. Review the original specifications, permissible loads and relevant operating conditions before using the estimate.

Formula

Table feed [mm/min] = rpm × effective tooth count × feed per tooth [mm]; time [min] = total path [mm] / table feed.

Worked example

At 3,000 rpm, four teeth and 0.05 mm/tooth the feed is 600 mm/min; 210 mm travel takes 21 seconds.

Common mistakes

  • Using values with inconsistent units or reference conditions
  • Accepting the example values as actual equipment specifications
  • Treating a model estimate as safety approval

Frequently asked questions

Can the result be used for selecting equipment?

Not on its own. Check performance curves, permissible loads and the real operating conditions independently.

Can I replace the example inputs?

Yes. Use measured or documented values that refer to the same operating point and unit system.