Spring force and additional spring work
Compute force at a given deflection and the extra work performed on a linear spring, including any initial preload force.
Use the corresponding calculator with values for your product or project. This guide cannot verify local technical rules.
Open German calculator →Step-by-step guidance
1. Choose the correct physical inputs
Compute force at a given deflection and the extra work performed on a linear spring, including any initial preload force. Match all readings to the same operating condition. Confirm whether dimensions, forces or quantities are entered in the stated units; illustrative defaults must be replaced by actual measurements.
2. Compute with coherent units
Final force [N] = preload [N] + spring rate [N/mm] × deflection [mm]; work [J] = (preload × deflection + ½ rate × deflection²) / 1,000. Work through the conversion factors before comparing the model result with equipment data. This calculator evaluates the stated simplified physical relationship, not an independent measurement.
3. Check the practical limits
At 12 N/mm, 20 mm deflection and 10 N initial force, the final force is 250 N and added work is 2.60 J. The calculation does not establish safe operation or equipment suitability. Review the original specifications, permissible loads and relevant operating conditions before using the estimate.
Formula
Final force [N] = preload [N] + spring rate [N/mm] × deflection [mm]; work [J] = (preload × deflection + ½ rate × deflection²) / 1,000.
Worked example
At 12 N/mm, 20 mm deflection and 10 N initial force, the final force is 250 N and added work is 2.60 J.
Common mistakes
- Using values with inconsistent units or reference conditions
- Accepting the example values as actual equipment specifications
- Treating a model estimate as safety approval
Frequently asked questions
Can the result be used for selecting equipment?
Not on its own. Check performance curves, permissible loads and the real operating conditions independently.
Can I replace the example inputs?
Yes. Use measured or documented values that refer to the same operating point and unit system.
Example values are planning assumptions, not binding product specifications. Check local rules, supplier information and professional guidance. Electrical examples do not establish a safe installation or protection.
Related calculators
- Federkraft und Federenergie (German only)
