Calculate concrete volume, fresh concrete yield and the number of full bags for slabs or foundations.

Estimate the volume for a slab, strip, pad or cylindrical foundation. Enter the fresh-concrete yield from your chosen product rather than relying on bag weight alone.

Your project

m
m
m
cm
pcs
%
kg
l
EUR

Prices and costs use the currency you select; there is no exchange-rate conversion.

Convert measurements from US/UK units

The calculator keeps metric units. This optional helper converts measurements only; it does not exchange currencies or alter material assumptions.

Enter a positive value to convert.

See result ↓

Step-by-step guide

  1. Measure the actual length, width and thickness. For cylinders, enter the diameter instead.
  2. Add the number of repeated foundations and a realistic allowance for uneven ground or losses.
  3. Read the fresh-concrete yield in litres per bag on the product data sheet; this is not the same as the weight of dry mix.

Worked example

A 3 × 2 m slab 10 cm thick has 0.6 m³ or 600 l of net volume. With a 5% allowance, you need 630 l. At 12.5 l of fresh concrete per bag, that is 51 whole bags.

Calculation method

Rectangular volume = length × width × depth. Cylinder volume = π × (diameter/2)² × depth × count. Multiply by the allowance factor, then divide litres by fresh-concrete yield per bag and round up.

Before buying

Use the finished structural dimensions, not merely the outline of the excavation. Additional overdigging or uneven subsoil may increase the amount of concrete actually placed.

For bagged concrete, round up whole bags based on the manufacturer’s fresh yield. For ready-mixed concrete, use the total volume in cubic metres and confirm any minimum delivery quantity.

This is a quantity estimate, not a structural design. Concrete grade, reinforcement, bearing capacity and frost depth must be determined separately. Always use the yield of the selected concrete product.

Frequently asked questions

Can I calculate bags using kilograms alone?

No. Different dry mixes produce different volumes of fresh concrete. Use the yield printed on the bag.

Does this tell me whether a foundation is strong enough?

No. It estimates volume only; structural design is outside this calculator.

Product information and technical source

Product information and technical source ↗. Check your chosen product data sheet before ordering. This is a German reference and does not confirm local product compliance.

Related calculators

Gravel and crushed stone calculator · Paving block calculator · Wall paint calculator

Verify these product inputs before ordering

These are editable example values, not universal supplier specifications for your country. Check the chosen product label and update the fields above.

Fresh concrete per bag
12.5 l
Bag weight
25 kg

One specific product example was checked against German manufacturer information, not against your local product or building standards.

Concrete bags, cubic feet and US product yield

In the US, bagged concrete is often sold by weight in pounds while mixed yield is shown in cubic feet. The weight printed on a bag is not the wet concrete volume. Enter the supplier’s fresh yield as litres per bag, not its weight in litres.

If the pack gives 0.60 ft³ of fresh concrete, that equals about 16.99 litres. Treat that as a product example only, not as the default for every bag. For volume-based delivery, compare the calculated cubic metres with the supplier’s ordering unit.

Additional manufacturer / specialist reference (product-dependent): QUIKRETE concrete mix yield reference